Decreasing the costs. |
| |
Improving the Decision process. |
| |
Improving Customer Service. |
| |
Improving the contribution, coordination and communication. |
| |
Providing access to integrated information from all areas to improve strategic decision making. |
| |
Control Panels. |
| |
Resources location: asset inventory. |
| |
Map the resources toward the areas with problems. |
| |
Asset Management. |
| |
Automatic meter reading. |
| |
Network management: water, gas, electricity and communications. |
| |
Regulatory achievement. |
| |
CRM integration. |
| |
Administración Energética |
| |
"One Call". |
| |
Emergency Prevention. |
| |
Energy management. |
| |
Economic development. |
| |
ERP Integration. |
| |
Environmental Management |
| |
Leak detection. |
| |
Labor Force Administration in Field. |
| |
Analysis of Networks. |
| |
Network Integrity. |
| |
Operations, Maintenance and Inspections. |
| |
Blackout Control. |
| |
Land management. |
| |
Control de Apagones |
| |
Drawings P&ID (Piping and Instrumentation Diagram). |
| |
Plant License & Re-License. |
| |
Contaminants tracking. |
| |
Remote Sensoring. |
| |
Route optimization. |
| |
Hydraulic models. |
| |
Plant management. |
| |
Collection distribution reports by zones or areas. |
| |
Identification of the zone without services for infrastructure works planning. |
| |
Establishing criteria of re-zoning rates and services, county zoning, land use, etc. |